IEC PAS 62381:2004

IEC PAS 62381:2004

janvier 2004
Spécification publiquement disponible Annulée

Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry

defines procedures and specifications for the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.

Informations générales

Collections

Normes internationales IEC

Date de publication

janvier 2004

Nombre de pages

35 p.

Référence

IEC PAS 62381:2004

Numéro de tirage

1
Résumé
Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry

defines procedures and specifications for the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.
Norme remplacée par (1)
IEC 62381:2006
novembre 2006
Norme internationale Annulée
(pas de titre français)

Besoin d’identifier, de veiller et de décrypter les normes ?

COBAZ est la solution simple et efficace pour répondre aux besoins normatifs liés à votre activité, en France comme à l’étranger.

Disponible sur abonnement, CObaz est LA solution modulaire à composer selon vos besoins d’aujourd’hui et de demain. Découvrez vite CObaz !

Demandez votre démo live gratuite, sans engagement

Je découvre COBAZ