IEC 60683:2011

IEC 60683:2011

October 2011
International standard Current

Industrial electroheating equipment - Test methods for submerged-arc furnaces

IEC 60683:2011 specifies test procedures, conditions and methods according to which the main parameters and the main operational characteristics of a submerged-arc furnace (SAF) with rated electrical power levels above 500 kVA are established. This standard is applicable to SAF with one or more electrodes. In order to determine further technical or economic assessments, additional tests may be necessary. Tests for some special equipment for semiconductor converter controlled furnaces, such as controlled rectifiers or controlled a.c. converters, are covered by IEC 60146-1-1. This second edition cancels and replaces the previous edition published in 1980 and constitutes a technical revision. Significant technical changes with respect to the previous edition are as follows:- Clause 1 (Scope and object) - the types of furnaces covered by this standard are more clearly defined.- Clause 2 (Normative references) and Clause 3 (Terms and definitions) have been updated and completed.- A new Clause 4 (Features of the SAF sytem) has been added; it mainly concentrates on the tests necessary for high voltage/high current electrical equipment in the installation.- Clause 5 (Tests and general conditions) and Clause 6 (Technical tests) have been modified according to today's requirements for safe operation of a SAF.

Main informations

Collections

International IEC standards

Publication date

October 2011

Number of pages

29 p.

Reference

IEC 60683:2011
Sumary
Industrial electroheating equipment - Test methods for submerged-arc furnaces

IEC 60683:2011 specifies test procedures, conditions and methods according to which the main parameters and the main operational characteristics of a submerged-arc furnace (SAF) with rated electrical power levels above 500 kVA are established. This standard is applicable to SAF with one or more electrodes. In order to determine further technical or economic assessments, additional tests may be necessary. Tests for some special equipment for semiconductor converter controlled furnaces, such as controlled rectifiers or controlled a.c. converters, are covered by IEC 60146-1-1. This second edition cancels and replaces the previous edition published in 1980 and constitutes a technical revision. Significant technical changes with respect to the previous edition are as follows:
- Clause 1 (Scope and object) - the types of furnaces covered by this standard are more clearly defined.
- Clause 2 (Normative references) and Clause 3 (Terms and definitions) have been updated and completed.
- A new Clause 4 (Features of the SAF sytem) has been added; it mainly concentrates on the tests necessary for high voltage/high current electrical equipment in the installation.
- Clause 5 (Tests and general conditions) and Clause 6 (Technical tests) have been modified according to today's requirements for safe operation of a SAF.
Replaced standards (1)
IEC 60683:1980
January 1980
International standard Cancelled
Test methods for submerged arc furnaces

Standardizes submerged arc furnace test conditions and methods to determine their main parameters and technical characteristics. Applies to industrial three-phase submerged arc furnaces with rated power level of 1 000 kVA or more. Also applies to furnaces having one or more electrodes, other than three-phase furnaces.

Need to identify, monitor and decipher standards?

COBAZ is the simple and effective solution to meet the normative needs related to your activity, in France and abroad.

Available by subscription, CObaz is THE modular solution to compose according to your needs today and tomorrow. Quickly discover CObaz!

Request your free, no-obligation live demo

I discover COBAZ