IEC 60964:2009

IEC 60964:2009

February 2009
International standard Cancelled

Nuclear power plants - Control rooms - Design

IEC 60964:2009 provides functional design requirements to be used in the design of the main control room of a nuclear power plant to meet operational and safety requirements. Also provides functional interface requirements which relate to control room staffing, operating procedures, and the training programmes which, together with the human-machine interface, constitute the control room system. This new edition takes into account the fact that software engineering techniques advanced significantly in the intervening years and introduces consistency with the latest revisions of relevant IAEA documents.

Main informations

Collections

International IEC standards

Publication date

February 2009

Number of pages

78 p.

Reference

IEC 60964:2009

Print number

2 - 25/03/2009
Sumary
Nuclear power plants - Control rooms - Design

IEC 60964:2009 provides functional design requirements to be used in the design of the main control room of a nuclear power plant to meet operational and safety requirements. Also provides functional interface requirements which relate to control room staffing, operating procedures, and the training programmes which, together with the human-machine interface, constitute the control room system. This new edition takes into account the fact that software engineering techniques advanced significantly in the intervening years and introduces consistency with the latest revisions of relevant IAEA documents.
Replaced standards (3)
IEC TR 62247:2003
October 2003
Technical report Cancelled
Nuclear power plants - Main control room design - A review of the application of IEC 60964 (1989)

Is a technical report presenting information concerning the use of IEC 60964 and feedback from designers, safety authorities and vendors. Includes recommendations to improve IEC 60964 (1989). To be used in conjunction with IEC 60964 which is the main IEC standard for the design of main control rooms of nuclear power plants.

IEC/TR 61963:2005
February 2005
Technical report Cancelled
Nuclear power plants - Main control room - Comparison of IEC 60964 to similar standards on control room design

IEC 60964:1989
March 1989
International standard Cancelled
Design for control rooms of nuclear power plants

Applies to control rooms of new conceptual design, in order to meet operating and safety requirements. Establishes requirements for functional selection, design consideration and the organization of man/machine interfaces during normal and abnormal plant conditions, as well as procedures to verify and validate the functional design.

Standard replaced by (1)
IEC 60964:2018
November 2018
International standard Current
Nuclear power plants - Control rooms - Design

IEC 60964:2018 establishes requirements for the human-machine interface in the main control rooms of nuclear power plants. The document also establishes requirements for the selection of functions, design consideration and organization of the human-machine interface and procedures which are used systematically to verify and validate the functional design. These requirements reflect the application of human factors engineering principles as they apply to the human-machine interface during plant operational states and accident conditions (including design basis and design extension conditions), as defined in IAEA SSR-2/1 and IAEA NP-T-3.16. This third edition cancels and replaces the second edition published in 2009. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) to review the usage of the term “task” ensuring consistency between IEC 60964 and IEC 61839; b) to clarify the role, functional capability, robustness and integrity of supporting services for the MCR to promote its continued use at the time of a severe accident or extreme external hazard; c) to review the relevance of the standard to the IAEA safety guides and IEC SC 45A standards that have been published since IEC 60964:2009 was developed; d) to clarify the role and meaning of “task analysis”, e) to further delineate the relationships with derivative standards (i.e. IEC 61227, IEC 61771, IEC 61772, IEC 61839, IEC 62241 and others of relevance to the control room design); f) to consider its alignment with the Human Factors Engineering principles, specifically with the ones of IAEA safety guide on Human Factors (DS-492) to be issued.

Need to identify, monitor and decipher standards?

COBAZ is the simple and effective solution to meet the normative needs related to your activity, in France and abroad.

Available by subscription, CObaz is THE modular solution to compose according to your needs today and tomorrow. Quickly discover CObaz!

Request your free, no-obligation live demo

I discover COBAZ