IEC 61285:1994
Industrial-process control - Safety of analyzer houses
Describes t he physical requriements for the safe operation of the process analyser measuring system installed in an analyser house (AH) in order to ensure its protection against fire, explosion and health hazards. The contents of the corrigendum of October 1994 have been included in this copy.
Describes t he physical requriements for the safe operation of the process analyser measuring system installed in an analyser house (AH) in order to ensure its protection against fire, explosion and health hazards. The contents of the corrigendum of October 1994 have been included in this copy.
describes the physical requirements for the safe operation of the process analyser measuring system installed in an AH in order to ensure its protection against fire, explosion and health hazards. This standard extends beyond IEC 60079-16 to include houses with Zone 2 interiors and to apply to toxic hazards. (Appropriate national guidelines on toxic hazards are to be followed.)
COBAZ is the simple and effective solution to meet the normative needs related to your activity, in France and abroad.
Available by subscription, CObaz is THE modular solution to compose according to your needs today and tomorrow. Quickly discover CObaz!
Request your free, no-obligation live demo
I discover COBAZ