IEC 61400-25-5:2006
IEC 61400-25-5:2006

IEC 61400-25-5:2006

December 2006
International standard Cancelled

Wind turbines - Part 25-5: Communications for monitoring and control of wind power plants - Conformance testing

Specifies standard techniques for testing of conformance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended.This publication is of high relevance for Smart Grid.

Main informations

Collections

International IEC standards

Publication date

December 2006

Number of pages

45 p.

Reference

IEC 61400-25-5:2006

ICS Codes

27.180   Wind turbine energy systems
Sumary
Wind turbines - Part 25-5: Communications for monitoring and control of wind power plants - Conformance testing

Specifies standard techniques for testing of conformance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended.

This publication is of high relevance for Smart Grid.
Standard replaced by (1)
IEC 61400-25-5:2017
IEC 61400-25-5:2017
September 2017
International standard Current
Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing

IEC 61400-25-5:2017 specifies standard techniques for testing of compliance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended. This part of IEC 61400-25 defines: the methods and abstract test cases for compliance testing of server and client devices used in wind power plants; the metrics to be measured in said devices according to the communication requirements specified in IEC 61400-25 (all parts). This new edition includes the following significant technical changes with respect to the previous edition: - harmonization with structure and test cases in IEC 61850-10:2012; - reduction of overlap between standards and simplification by increased referencing to the IEC 61850 standard series.

Need to identify, monitor and decipher standards?