IEC 62381:2006

IEC 62381:2006

November 2006
International standard Cancelled

Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

IEC 62381:2006 defines procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification. It cancels and replaces IEC/PAS 62381 published in 2004. This first edition constitutes a technical revision. This bilingual version (2013-04) corresponds to the monolingual English version, published in 2006-11.

Main informations

Collections

International IEC standards

Publication date

November 2006

Number of pages

38 p.

Reference

IEC 62381:2006

Print number

1 - 15/12/2006
Sumary
Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

IEC 62381:2006 defines procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification. It cancels and replaces IEC/PAS 62381 published in 2004. This first edition constitutes a technical revision. This bilingual version (2013-04) corresponds to the monolingual English version, published in 2006-11.
Replaced standards (1)
IEC PAS 62381:2004
January 2004
Publicly available specification Cancelled
Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry

defines procedures and specifications for the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.

Standard replaced by (1)
IEC 62381:2012
February 2012
International standard Cancelled
Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

IEC 62381:2012 defines the procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification. The description of activities given in this standard can be taken as a guideline and adapted to the specific requirements of the process, plant or equipment. This second edition cancels and replaces the first edition published in 2006. This edition constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in this standard is in accordance with future IEC 62708.

Need to identify, monitor and decipher standards?

COBAZ is the simple and effective solution to meet the normative needs related to your activity, in France and abroad.

Available by subscription, CObaz is THE modular solution to compose according to your needs today and tomorrow. Quickly discover CObaz!

Request your free, no-obligation live demo

I discover COBAZ