IEC 62439-3:2012

IEC 62439-3:2012

July 2012
International standard Cancelled

Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

IEC 62439-3:2012 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: duplication of the LAN, resp. duplication of the transmitted information. This second edition cancels and replaces the first edition published in 2010. It constitutes a technical revision. The main changes with respect to the previous edition are:- specification of the interconnection of PRP and HSR networks;- introduction of a suffix for PRP frames;- clarification and modification of specifications to ensure interoperability;- slackening of the specifications to allow different implementations;- consideration of clock synchronization according to IEC 61588;- introduction of test modes to simplify testing and maintenance.This publication is to be read in conjunction with IEC 62439-1:2010.

Main informations

Collections

International IEC standards

Publication date

July 2012

Number of pages

177 p.

Reference

IEC 62439-3:2012

Print number

2 - 25/07/2012
Sumary
Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

IEC 62439-3:2012 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: duplication of the LAN, resp. duplication of the transmitted information. This second edition cancels and replaces the first edition published in 2010. It constitutes a technical revision. The main changes with respect to the previous edition are:
- specification of the interconnection of PRP and HSR networks;
- introduction of a suffix for PRP frames;
- clarification and modification of specifications to ensure interoperability;
- slackening of the specifications to allow different implementations;
- consideration of clock synchronization according to IEC 61588;
- introduction of test modes to simplify testing and maintenance.

This publication is to be read in conjunction with IEC 62439-1:2010.
Replaced standards (1)
IEC 62439-3:2010
February 2010
International standard Cancelled
Industrial communication networks - High availability automation networks - Part 3 : parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

Standard replaced by (1)
IEC 62439-3:2016
March 2016
International standard Cancelled
Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

Need to identify, monitor and decipher standards?

COBAZ is the simple and effective solution to meet the normative needs related to your activity, in France and abroad.

Available by subscription, CObaz is THE modular solution to compose according to your needs today and tomorrow. Quickly discover CObaz!

Request your free, no-obligation live demo

I discover COBAZ