IEC TR 61850-90-2:2016
Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres
IEC TR 61850-90-2:2016(E) provides a comprehensive overview of the different aspects that need to be considered while using IEC 61850 for information exchange between substations and control or maintenance centres or other system level applications. In particular, this technical report:- defines use cases and communication requirements that require an information exchange between substations and control or maintenance centres;- describes the usage of the configuration language of IEC 61850-6;- gives guidelines for the selection of communication services and architectures compatible with IEC 61850;- describes the engineering workflow; introduces the use of a Proxy/Gateway concept;- describes the links regarding the Specific Communication Service Mapping.
IEC TR 61850-90-2:2016(E) provides a comprehensive overview of the different aspects that need to be considered while using IEC 61850 for information exchange between substations and control or maintenance centres or other system level applications. In particular, this technical report:
- defines use cases and communication requirements that require an information exchange between substations and control or maintenance centres;
- describes the usage of the configuration language of IEC 61850-6;
- gives guidelines for the selection of communication services and architectures compatible with IEC 61850;
- describes the engineering workflow; introduces the use of a Proxy/Gateway concept;
- describes the links regarding the Specific Communication Service Mapping.
COBAZ is the simple and effective solution to meet the normative needs related to your activity, in France and abroad.
Available by subscription, CObaz is THE modular solution to compose according to your needs today and tomorrow. Quickly discover CObaz!
Request your free, no-obligation live demo
I discover COBAZ