IEC 61771:1995

IEC 61771:1995

December 1995
International standard Current

Nuclear power plants - Main control-room - Verification and validation of design

Specifies verification and validation procedures for the design of t he control-room system of nuclear power plants and gives verificatio n and validation criteria for the assignment of functions and for the integrated control-room system.

Main informations

Collections

International IEC standards

Publication date

December 1995

Number of pages

87 p.

Reference

IEC 61771:1995

Print number

1 - 13/06/2005
Sumary
Nuclear power plants - Main control-room - Verification and validation of design

Specifies verification and validation procedures for the design of t he control-room system of nuclear power plants and gives verificatio n and validation criteria for the assignment of functions and for the integrated control-room system.
Need to identify, monitor and decipher standards?

COBAZ is the simple and effective solution to meet the normative needs related to your activity, in France and abroad.

Available by subscription, CObaz is THE modular solution to compose according to your needs today and tomorrow. Quickly discover CObaz!

Request your free, no-obligation live demo

I discover COBAZ